The electric installation is done whit the aircraft quality AWGxx teflon wires.

(Some system is then whit its own cabling from power distribution out to the unit.)

The backup system is direct switched from panel switch to the fuel pumps and to the engine controller.

 

  Buildinglogg: RV-7A, Rune Eilertsen, Rudkøbing, Denmark  
  Electric installation  
Date Working description hour
08.09
Instrument board - electric. Mounting 4 12V power outlet in the map-box
1
09.09
Cabling and labeling PC and PC screen. 
2
11.09
Continue wiring work on instrumet panel. (PC solution konfig.)
1
15.09
Mounting heater faan control knob, make wiring and test ing whit battery on
1,5
16.09 Shortening the com and VGA cable so fits beter behind instrument panel. 1,5
16.09 Wiring the remote compass connector, and labeling it 0,5
16.09 Soldering 15pin connector for XCOM-760. (halft the pins..missing some parts  1
1.10 Electric install, instrument panel. mount EXP-IND module + fuses for secondary power. 4
02.10 Mounting the serial to grey-code converter. Soldering the db25 pin for the transponder.. Wire the fuses for secondary battery. 5
06.10 Make the wiring to the control sticks. 5
13.10 Solder wires for the fuel flow forward/return sensors 4
23.10 Soldering the headset wires, and connectors to the Xcom -760 1,5
27.01 Working whit battery connector, placing amp meter shunt, and main power amp limiters 2,5
28.01 soldering ring-connectors, make wires for the starter, battery etc. 2
30.01 Drill 40mm hole true the firewall, disassemble harness, so can put true the opening, and clamp on the nylon bulkhead protection. 2
31.01 Make the nr. 2 bulkhead wire pass true for firewall. Also mount the fuel return regulator. The throttle cable pas true, fuel lines, break fuel,  is the ones missing now to passing the firewall. 3
01.02 More main power cable work..... 1
02.02 mounting batteries, and connect main cables. 2
   
  Total 40,5

 

 

 

l

The link for the electric schematic will came here little later on, when I have made document for the actual installation.

 