NightFlyer.dk - Project site
Van's RV-7A Quick build KIT,
Eggenfellner Subaru H-6 engine
Startside Index Search in Nightflyer.dk Guestbook Contact Info

Building log all

Project choises • Building log all • Electric and instruments • Airframe work • Control system and brakes • Firewall forward • Pictures -album • Youtube-links • Links
 

Tilbage Startside Næste

 

 

 

  Buildinglogg: RV-7A, Rune Eilertsen, Rudkøbing, Denmark  
  Logg - total list.  
Date Working description hour
Assembling the wheels 3
   
01.07 Instrument panel - makes cut out for test assembling the  instruments to the instrument panel. 5
24.07 Vertical stabilizer - fit together all parts, dimpling, deburr skin, spars 4
24.07 Rudder, calico mounting, stiffener alignment to skin. 3
07.08 boring holes for alarm light and manual backup battery override breakers 1,5
09.08 Get seatbelts, checking and aligning the hardware, "put in storage" 1
10.08 Get delivered the 2.stk. map box from VANs, primed the main parts 1
11.08 Riveting the map boxes house together. 0,5
12.08 Make map box hole in instrument panel. Make hole for EXT-Ind module 2
12.08 edge smoothing instr. Panel, borring missing holes, boring back plate Dynon 1
13.08 Mounting the map-boxes to the instrument panel 2
14.08 Make the instrument panel upper support angel 2
14.08 Priming instrument panel, test fittings the main instruments. 2
15.08 Glue vinyl on to instrument panel, mounting instruments. 2

16.08

Instrument panel finished, waiting for Ins-Ind module for power module.
2
19.08 Vertical stabilizer - smooth edges, deburr, priming, ready for final assembling 3
19.08
Nits the vertical-stab together. Back spare finished, ready to nit on to front part  
3
20.08
Vertical stab. Is finished and put to "storage" Continue on the rudder
3
20.08
Rudder frame priming, assembling and nitting.
4
21.08 
Left rudder skin dimpled and primed, stiffeners profiles formed and primed. 
2
22.08
Finished "back-rivet" left skin, primed it, starting on right rudder skin.
4,5
23.08
Right skin rivet, fabricate fastening stripe for fiberglass lower end
2,5
27.08
Riveting rudder skins to rudder frame, 
3
28.08
Priming and dimpling part for horizontal stab.
2,5
29.08
Trimming parts, and riveting hinges on back spare for the HS
2,5
29.08
Priming last HS parts, riveting the back spare main bearing.
2
30.08
HS rear spare finished
2
08.09
Instrument board - electric. Mounting 4 12V power outlet in the map-box
1
09.09
Cabling and labeling PC and PC screen. 
2
11.09
Continue wiring work on instrumet panel. (PC solution konfig.)
1
15.09
Mounting heater faan control knob, make wiring and test ing whit battery on
1,5
16.09 Shortening the com and VGA cable so fits beter behind instrument panel. 1,5
16.09
Wiring the remote compass connector, and labeling it
0,5
16.09
Soldering 15pin connector for XCOM-760. (halft the pins..missing some parts 
1
22.09
Drill the plate for the firewall opening, makes ready for the cabin heater mounting in this plate.
1
23.09
Makes the battery holder to fit on the inside off the firewall. Rubber materiel is glued to the box inside, for protecting the batteries.
5
24.09
Make support braket for battery holder. Fits the heater to firewall
2,5
26.09 Priming some dashboard parts, drill the pedal nylon blocks 1
27.09 Test mount the pedals system to fuselage. Turning the heater motor 180 degree 2
28.09 Continued whit the work on the pedals and inside firewall 1
30.09 Continue inside firewall work, + assembling the IVO Prop Magnum propeller 2
30.09 more... inside firewall work. 1
01.10 Electric install, instrument panel. mount EXP-IND module + fuses for secondary power. 4
02.10 Mounting the serial to grey-code converter. Soldering the db25 pin for the transponder.. Wire the fuses for secondary battery. 5
06.10 Make the wiring to the control sticks. 5
07.10 Test fit the wheel strut to the chassis mount bracket. Make the right back panel , so map-box go true it. 5
13.10 Solder wires for the fuel flow forward/return sensors 4
15.10 remove material for the left side wheel bracket. 1
18.10 Soldering PC start button wires, mounting the external USB connectors 2
20.10 Priming cabin floor, make soundproofing cut-out, mounting the transponder antenna. 3
21.10 Mounting the upper wheel fastening bracket.  Drilled the remains holes in cabin side for the bracket. 3
22.10 Mounting the right wheel axel to the bracket. 1
23.10 Soldering the headset wires, and connectors to the Xcom -760 1.5
28.10 Test mounting the main wheels, brakes and fastenings points for the wheel fairings. 1,5
03.11 Priming aluparts for wheel assembly, Mount the left wheel axel. the left 4
04.11 Priming more parts for cabin., mount wheel on the axel. 4
18.11 Nose-leg drilled in the local machine shop 1
19.11 Priming and paint the nose-leg. (for corrosions protection only.) 0,5
20.11 Install engine mount to airframe 5
21.11 Engine is finished bolt on to airframe 2
15.12 Make cut out for the front leg in lower cowling. Test on airplane (ruff test fit) 1,5
20.01.08 Sorting part for fuel lines and breakes, looking at the plans, planning :-) 1
27.01 Working whit battery connector, placing amp meter shunt, and main power amp limiters 2,5
28.01 soldering ring-connectors, make wires for the starter, battery etc. 2
30.01 Drill 40mm hole true the firewall, disassemble harness, so can put true the opening, and clamp on the nylon bulkhead protection. 2
31.01 Make the nr. 2 bulkhead wire pass true for firewall. Also mount the fuel return regulator. The throttle cable pas true, fuel lines, break fuel,  is the ones missing now to passing the firewall. 3
01.02 More main power cable work..... 1
02.02 mounting batteries, and connect main cables. 2
05.02 Make the cut out for the instrument panel. 1
06.02 Test mount the instrument panel. 1
29.02 make a EXP-bus important switches protection. (fysical "turn off" protection for ignition and fuel pump 1
13.03 make a fiberglass center consol from instrument panel to fuel selector. 1
24.03 Connect heater hoses, Working on electric installation for engine. 1
26.03 Find local supply for 1/4" NPC to 3/8" tube, mount to the gascolater. Has tested flare tool for AN fittings in a "sample" tube. To morrow will begin make tubing's and fuel lines. 1
27.03 Finish ground block and engine ground cables 1
29.03 Finish engine ground cables and mounting gascolator in firewall 1,5
30.03 Working on fuel lines.  Use the flange tool to connect tube to AN fittings 3
03.04 Make center consol for instrument panel 3
07.04 Mounting the coolant expansions thank to firewall, remove the instrument panel temporary fit, to nit and to get room for finish the fuel lines. 2
08.04 make the reinforce angles around the inner frame, where map box goes true. 2
09.04 Finish nit the map box inner frame profiles, make instrument panel canopy seal profile 6,5
13.04 Work on canopy quick release system 4
14.04 Continue on the quick release system, finish rudder pedals. 5
16.04 Mounting brake pedals, and mounting pedals in to cabin 2,5
17.04 Finish brake oil expansions thank, and tubing to pedals. 2
18.04 Mount the cold air intake scoop, mounting terminal clip for engine wires 2
19.04 Continue engine wiring clip and prepare battery strap, finished pedal mounting in airplane.. 1,5
20.04 fuel retur line true the firewall , and connect the flex fuel line on engine side.+div 2,5
22.04 Modify the engine air box assembly so it actually fits the air filter :-) 1
22.04 Mounting the engine ECU, and temporary fit air box to engine installation. 1
25.04 Make fuel line and electric for test running the engine. Also install main and backup bus fuse and distribution block close to the battery, for securing the installations. 2,5
26.04 Relocate intake air temp probe ( as service bulletin rec.), Begin make control rods assembling. 3,5
27.04 Finish control rods assembling. Mounting the control stick and rods in to the fuselage. 6
28.04 Assembling electric aileron trim kit, mounting it in the airplane. 3
29.04 aft control rod/system assembling 2
30.04 Electric flaps installation. Assembling the hardware for mounting the flap motor. 3
01.05 Continue flaps motor installation. Start on canopy lock system 8
02.05 Finish canopy lock system, ready to nit it in place. 8
03.05 Finish air filter  lock mod. Make cover for fuel pumps (center consol) 6
04.05 Work on different items, fastening heater tubes, prepare break lines true floor etc.. 4
05.05 Make fuel vent lines , right side. Put some on the electric terminals to engine, so can tighten whit out damage the crimp connectors. 5
08.05 Mounting seat belt wire, to frame., install rudder wire in fuselage. 1
09.05 Mounting seat belt protection/sliding plastic  to the baggage back wall opening to seat belt anker wire. 3
10.05 Make left side break wire, test sound level whit external mufler. 3
11.05 Work on break lines, and return fuel line. 2
12.05 Continue the fuel line and the double fuel valve mounting. 3
18.05 Almost complete fuel lines, and fuel valve mounting. Left thank fuel line then has one flat bend need make new. Lucky I have not cut the tube yet on that  outside part. (so push in few inched, make new bend, and AN flange.) 1,5
23.05 Insert instrument panel frame to fuselage. Fits the front upper skin, and drill it together whit firewall bulkhead top, and instrument panel frame. 2,5
25.05 mounting fuel tank , fuel sensors. 3
31.05 Working on seat arrangement 6
05.06 Dimpling skin and instrument panel ribs 1
07.06 Riveting the instrument panel frame to cabin, rivet together the seat back. 5
08.06 Finish the other seat back. Mounting the right break caliper, and connecting the break tube after flaring it. 6
21.06 Mounting spinner back plate to propeller hub. Change engine mount bolts to correct length bolts. 3
29.06 Working on lower cowling hinge 5
04.07 Working on lower cowling adjusting to spinner. 2
16.08 Priming vertical stab. , rudder, and parts for horizontal  stab., also spinner and seat back plates. ( My Norwegian friend is testing the paint gun in this picture.) 6
17.08 Make aircraft body ready for inside/outside primer.  (masking and disassemble inside..) 4
18.08 Priming inside body, 2 layer of primer 4
19.08 Priming outside body. 6
24.08 Priming ailerons, flaps, pushrods etc. 3
28.09 Drill and tap the connection rod for canopy opening. (1/4-28) Waiting for controller coming to check out my work. 1,5
25.10 Working on instrument panel wiring, and added a 2 1/4" airspeed and altitude instrument. 3
31.10 Preparing for topcoat inside cabin. Finish pop rivet the floor panel. 3
01.11 Continue riveting the nut plates to bag compartment floor. 2
02.11 Make the seat back adjustment system 2
03.11 Make some parts for roll-bar assembling, drilling and test mounting the parts together, adjusting roll bar to correct size. Same also for canopy frame (roll bar) as  well. Also make the canopy handle assembling. 5
16.11 Working on the roll bar. 4
14.12 Riveting together the roll bar half (The left and right together) 2
18.01.09 Riveting the front and rear roll bar half together. 5
20.01 finish the roll bar. pop-rivet the front and back half's together. 2
24.01 Working on the brackets and base for the roll bar. 3
25.01 Assembling canopy frame. Adjusting frame and make it fit to airframe. Riveting frame together. (Sides and back, aligned to roll-bar.) 5,5
31.01 Working on forward canopy frame.  (adjust and drill inside reinforcement plates 2
01.02 Continue work from the 31.01 2
07.02 same..  Work on Canopy frame. Make brackets for the gas-strut, countersink drill-holes etc. 5
08.02 Finish the bracket for gas-struts, and do the last tilt-up frame rivet and assembly. Priming the canopy tilt-up frame, instrument panel skin, and the roll bar 7
09.02 clicko dashboard skin to canopy frame 0,5
21.02 Riveting canopy frame skin to the frame. Riveting inside reinforcement to frame 6
22.02 Drill the canopy hinge. Press the press center boss in to hinge. (one center boss brakes because of wrong drill bit in use, need to find replacement part.) 6
01.03 Mounting quick release hinge for canopy frame, mounting the gas struts in
Starts the engine, as it has not be turned in half year time. Started 1. time, stopped after rev up to ca. 1800 rpm, then 2. start make it run stabile.
6
06.03 Making the one side "skirt" to the canopy frame. 3
07.03 Left side canopy skirt, and also made the roll bar bolt fastening to the base. 4
08.03 Put on left side piano hinge for cowling, AND.. MAKE THE BIG CUT. (Canopy cut) 8
13.03 priming parts, forward and aft canopy skin, inside cabin parts etc. 6
14.03 smoothing the roll bar whit fiberglass sparkle, outside and inside 6
22.03 Mounting the aft canopy glass.  6
28.03 countersink the aft canopy glass, also work on adjustable seat-back brackets. 4
29.03 rivet the aft canopy skin. Rivet the seat back brackets 6
12.04 Adjusting and fits the front canopy glass to the frame. Drill the canopy frame for fastening points for the canopy. 2
13.04 Final adjust to the forward canopy glass. 7
10.05 Work on left aileron/wing hinges etc 6
31.05 prepare for priming parts on wing, and make the aileron pushrod link 4
31.05 Clico the front skin. Find out it slightly moves the canopy aft wards. Need sanding the canopy aft edge to refit after this . 2
   
   
   
   
   
Total 457

Photos from building log

 

 

Items of interest
04.11.08
I have got last shipment from Aircraftspruce, where an separate altitude and airspeed indicator  that fits 2 1/4 inch instrument opening.
Also a flap position system whit automatic trim correction was in the order.
That means only item missing now is autopilot. Autopilot will be "excluded" for now.. as my building budget is some over the top :-) Also autopilot was not initial planned, but adjustments to instrument panel have make room for the special add-on to my Dynon Flightdeck.
So I make ready for the autopilot to be fitted later, and make ready all wiring so it can easy be mounted when is ready to get it.
Nightflyer blog

Nightflyer blog on MSN Live

 

Project product links:

 

1.    Vans Aircraft

2.    Eggenfellner Subaru

3.    Dynon EFIS

4.    XCOM Radio

5.    Aircraft Spruce shop